Bellevue Bathroom Remodel

Victory Home Remodeling offers efficient solutions for Bellevue bathroom remodel that aims to make your bath more functional and beautiful. With the most trusted Bellevue bathroom remodeling contractors by your side, you can create your elegant bathroom sanctuary to relax in luxury.

Our team would help you with a wide range of bathroom remodeling service, including a full bath layout redesign or addition of utility. We would also help you with specific tasks like installing a new bathtub or vanity and setting up a shower enclosure.

A well-planned bathroom remodel can be divided into many different stages like designing, getting the permits, construction, and others. Victory Home Remodeling  would help you execute all these stages so that you get a truly stunning bathroom.

Design Recommendations for Bathroom Remodel

When you are thinking of bathroom remodel in Bellevue, you would need to consider the basic requirements that will allow you to efficiently use the bath space.

Here are some of the space requirements for some of the key components of your bathroom

Bellevue Bathroom Remodel

Commode or Water Closet

When you are deciding on the position of your commode, make sure that you keep a space of about 3 feet 4 inches on the wall. In case you have a compact bathroom, you should keep a space of around 30 inches on the wall.

The minimum space in front of the commode should be around 30 inches. However, if you are going for a wall-mounted commode, then you can do well with less space.

Shower Enclosure

A square shower enclosure will measure about a minimum of 3×3 feet. On the other hand, a rectangular shower enclosure would be a minimum of 3×4 feet.It is recommended that you fix the shower at a height of 6 feet and 6 inches from the floor level. It would be better if the faucets and the hot and cold mixers are at a height of around 4 feet from the ground, as that would make it easier to reach.

Tub Enclosure

As a professional bathroom remodeling contractor in Bellevue, we have experience in installing all kinds of bathtubs. We recommend that the plumbing fixtures should be installed at a height of 33 inches from the floor so that they can be accessed from the tub itself.

Bathroom Door

A door that leads into the bathroom should be about 30 inches to 33 inches wide. The absolute minimum should be 28 inches in width.When we help you with the designing of the layout of your kitchen, we would ensure that all these requirements are taken into consideration. We would ensure that you have enough space which makes it easy to move around and use your bath space without any hassles.

The Process of Bellevue Bathroom Remodel

We understand that every bathroom is different and homeowners often have their own needs. To meet those unique demands, we offer customized solutions for Bellevue bathroom remodel that are tailored to meet your needs.

Overall, the process of remodeling or renovating bathrooms can be divided into different broad stages. At Victory Home Remodeling, we follow a streamlined approach that helps to deal with the construction challenges and minimize the time and costs of completing the project.

Here are the main stages of the process that we follow for bathroom remodeling in Bellevue.

1. First Meeting

The first stage of the process is planning, where you set clear goals about what you want from the project.

We will visit your premises and analyze the existing bath space. We will also have a detailed discussion with you about the things you want to be done. This would help in creating an actionable plan.

2. Estimate & Design

Next, a cost estimate will be prepared based on the initial discussions. This would include the cost of the materials, the fees for the permits (if any), the labor costs, and any other such components.

Our Bellevue bathroom remodel contractor will create 3D designs that will help you visualize how your bathroom will look once the work is completed. After getting your approvals, we would proceed to the next step.

3. Bath Remodeling Permit

After the designs are finalized, we would have to apply for permits. When you are remodeling a bathroom, you must apply for a remodeling permit at the Department of Development Services in the City of Bellevue.

In most cases, you would need to apply for the Single Family Remodel Permit. In some cases, you can qualify for a Single Family Remodel Permit – No Plan Review. This might help you to get the permit in significantly less time. Speak to our consultant for bathroom remodeling in Bellevue to know which plan would work best for you.

Based on certain cases, you might need to apply for other permits as well:

Plumbing Permit: If you are looking to make significant changes, like replacing your bathtub with a 2-inch drain, and comply with the building codes then you would need to apply for a plumbing permit.

Electrical Permit: When you are looking to make significant changes to your bathroom’s electrical system, like getting a new heating system, then you would need to apply for an electrical permit.

Contact us and we would help you deal with the entire process of getting a permit for bathroom remodeling so that you don’t have to go through the hassles.

4. Work Begins

After getting your approval on the design and the required remodeling permits from the City Council, we would begin the remodeling work. As one of the most experienced Bellevue bathroom remodelers, we complete the work in the following phases to maximize efficiency.

Deconstruction: Based on the design, we might have to deconstruct your existing bathroom first. We will tape off the area and ensure that the debris doesn’t spread to the other areas of your home.
Framing, Electrical & Plumbing Work: Once the deconstruction work is completed, we would install the new frames, electrical wiring, and pipes to get a sturdy infrastructure in place. During this stage, the initial inspection would be done by the City office.
Hanging Drywall and Insulation: After the inspection is done and the work is approved, we would hang and finish your drywall and insulation. This would give a kind of form to your bath space and also offer an effective insulation and heating system.
Tiling: At this step, we would work on the tiling of the walls and floors of your bath. We would also work on installing the backsplash and sink countertops. To ensure a perfect finish, we would use proper elevation, installation, and grout sealing techniques.
Fixing, Refinishing, or Installing Shower Trims, Tub, and Toilet: You will either need to fix and refinish or upgrade your toilet, tub, and shower trim to enhance the functionality and comfort of your bath. Fixing and refinishing would be a cost-effective option.
Bathroom Vanity and Cabinets: Last but not the least, we would need to work on your vanity tops and cabinetry. We can install quartz, granite, marble, and other kinds of countertops with ease. When it comes to cabinets, we can install hardwood, laminate, and particle board cabinets. We can also refinish your cabinets, a cost-effective and time-saving option.
Final Checks: After the work is done, we would run a final check to make sure that everything is done and finished to perfection.

5. Scheduling Inspection

Once all the work is done, we would run a thorough check before the scheduled inspection. As a bathroom remodeling contractor, we would help you handle the inspections.

The City Council would then send an inspector to ensure that all the work is done according to the designs that were sent to the department. After everything checks out, they will give you the final approval.

The city inspectors would visit your premises multiple times to ensure that the work is being done according to the approved plan.

  1. Rough In Inspection – This is the first inspection. Once all the electrical and plumbing work is done and just before the walls are closed up, the electrical, plumbing, and building inspectors will ensure the work is done up to the code.
  2. Second Inspection – Once the work is done, another round of inspection will be conducted and you will be given a checklist of items that need to be changed. We would schedule another inspection by the City Inspectors for verification.
  3. Final Inspection – When we have checked everything is done to perfection, the inspectors would visit and inspect the bathroom before giving you the final approval.
Bathroom-Remodel

Approximate Timeline for Bellevue WA Bathroom Remodel

Here is a brief outline of the approximate time it will take to complete the major stages of your bathroom remodel process:

Work Time (Approximate)
Deconstruction 1 to 2 days
Installing new frames 2 to 4 days
Rough-in work 4 to 10 days
Initial Inspection 1 day
Installing/Repairing doors and windows 2 to 4 days
Drywall & insulation 1 to 2 days
Tile installation 3 to 7 days
Painting 2 to 5 days
Vanity installation 3 to 5 days
Cabinets 1 to 2 days
Upgrading shower, tubs, toilet: 2 to 4 days
Final inspection and adjustments 2 to 4 days

 

This is just an estimate of the time taken to complete the tasks for Bellevue bathroom remodel. The time taken would depend on the work that is to be done and its complexity. After carefully assessing your kitchen and your requirements, our team would be able to give you a more accurate estimate.

Frequently Asked Questions

Here are some of the most commonly asked questions that our customers often have. Have any other queries? Contact us.

Most of the bathroom remodel projects that we undertake are full remodels. We have remodelled bathrooms that are over 20 years old and everything was to be removed, including the flooring, fixtures, plumbing, and cabinetry.

References to our past projects are also available. They demonstrate the skill and professional approach of our team. To get references for some of our completed projects for bathroom remodeling in Bellevue, contact us.

Here is the step-by-step process of remodel a bathroom

  • Create design
  • Subflooring
  • Countertop installation
  • Select materials
  • Floor tile installation
  • Medicine cabinet installation
  • Order materials
  • Electric wiring
  • Light fixtures installation
  • Deliver materials
  • Wall preparation
  • Accessories installation
  • Demolition
  • Wall tile installation
  • Painting
  • Plumbing
  • Plumbing fixture installation
  • Touch up and cleaning