You need to keep certain design requirements in mind when you are remodeling your kitchen. Here are some of the most important things that you should do:
The doorway leading into the kitchen must be at least 32 inches wide.
All passageways in the kitchen should be at least 36 inches wide. In work areas, the passages should be 42 inches wide for a single cook and 48 inches wide if there are multiple cooks working at the same time.
It is recommended to have at least 158 inches of usable counter space in your kitchen. You would need to get countertops that are at least 24 inches deep and have 15 inches of clearance above.
All receptacles servicing countertop areas need GFCI (ground-fault circuit interrupter) protection. Your kitchen should also have at least one wall-switch-controlled light, with the switch being located at the entrance.
Windows and skylights should beat least 8 percent of the total square footage of the kitchen. You should also install an outdoor-venting kitchen ventilation system on top of your cooking surfaces.
As one of the most experienced general contractors in Bellevue, we would keep all the design requirements in mind and also consider Bellevue local building and zoning rules to make sure that you have a design that would get easily approved during the permit applications and also help you realize the full potential of your kitchen space.
Making your kitchen reflect your style is only half of the job. You would need to ensure that your kitchen functions in a way that makes your life easier. For example, you might get a kitchen island that also works perfectly as a breakfast bar. You can also get custom cabinets that would maximize storage space.
We specialize in whole kitchen remodeling in Bellevue. However, our team would also help you with the following upgrades
The process for dealing with each of the above tasks. Here are the steps that we follow for kitchen remodeling in Bellevue.
After you set up a meeting with us, we would try to learn more about your vision for your kitchen. If you are unsure and want to get some design inspiration, we would provide you with samples of some of our previous work.
We would also closely assess your kitchen. This includes taking accurate measurements of the dimensions and understanding the structural characteristics of your kitchen space.
Based on the initial discussion, we would start working on the design. We would have a detailed discussion with you and talk about every single detail. After all, its your kitchen.
Understanding how your kitchen will look just by looking at the blueprints is not easy. That’s why we use a 3D model of your kitchen that would help you visualize how your kitchen would look once the work is done. Then we will give you an estimate.
After you have finalized the design, we would need to submit the application for the project at the local City Office. As a professional kitchen remodeling contractor in Bellevue, we would assist you with the process so that you don’t have to go through any hassles.
The Department of Development Services of the City of Bellevue offers two different types of permits for remodeling the kitchen, bath, or entire home. You have the
Single Family Home Remodel Permit – where you have to submit your plans for review during the initial application. This would take a few weeks of time.
In certain cases, you might qualify for
Single Family Home Remodel Permit – No Plan Review. This is a faster process as you don’t have to submit any plans for review. Speak to our experts for Bellevue Kitchen Remodeling to know more about whether you qualify for the permit or not.
Depending on the scope of the project, you might need to apply for the following permits.
Plumbing Permit: If you are looking to make significant changes, to the plumbing system of your kitchen, like changing the position of the kitchen sink, then you would need to apply for a plumbing permit.
Electrical Permit: Just like a plumbing permit, you would need an electrical permit when you are looking to make significant changes to the electrical layout and components of your kitchen.
Getting a permit for Bellevue kitchen remodel might be a hard challenge for many. Our Bellevue remodeling company would help you with the process including application, plan review, inspection and final approval.
After the designs are approved, we would begin the work of remodeling the kitchen. Based on the project, the following things would be done in the stage.
Your project might need your kitchen to be demolished first. In that case, you would need to tear down your existing walls and floors and strip down your kitchen to its bare minimum.
We would take care to avoid the plumbing and electrical system, unless we are looking to change that as well.
We would take care that the debris is kept away from other parts of your home. We would remove it safely after the deconstruction work is done.
The next step is the rough-in work including any framing and plumbing. Basically, this step is focused on the walls or what goes inside of the walls. In simpler remodels, it might just involve moving the frame in the walls around a new center island.
On the other hand, in large remodeling projects, you might have to move plumbing fixtures or add square footage to the space by pouring new concrete for an expansion.
After the rough-in work is done, it’s time to schedule your ‘rough-in’ inspection. We would be calling the City office of Bellevue and scheduling the first inspection. This might involve paying a small fee.
Based on the initial inspection, they might suggest changes. You would need to get incorporate them into the plan. Our team would handle it all.
After the revised plan (if required) is approved, we would move to the next step.
Once the plan is approved, it would be time to finish the walls. You would need to hang, tape, and finish the drywall according to the project plan. You might need to get drywall for the countertop bar or another section for the kitchen.
We often put a coat of primer on the drywall as it seals the facing paper and protects it against scuff and scrapes when installing other items.
After the drywall is done, we would install doors or windows. If the layout of the kitchen is the same as before, then you would not have to deal with this step. In that case, you would need to seal with the existing cracks.
If you are in the need to add new doors or windows, we first insulate them. This would help you save on energy costs. Unsealed kitchen doors and windows would make the space uncomfortable and also cost hundreds of dollars in heating and cooling bills.
At this stage, we would also install the trims which would make the cabinet installation more precise, and avoid gaps.
Next, we would be installing the cabinets and plumbing fixtures. If required, we would be also changing the position of the sinks, fitting the faucets, and setting up hot and cold water lines. In case your plumbing system has minor issues or simple upgrades to be made, we would deal with that as well.
We would also help you to install your new appliances. The positions would have been finalized during the design phase and this stage, and in this stage, the plan would be executed.
Some modern appliances would need specific electrical arrangements. We would ensure to get them in place before we install the appliances.
At the last stage, we would work towards installing the new flooring. In some cases, especially while installing tile and wood flooring, we might handle it before we install the cabinets. In other cases, we would keep it for last.
After we have checked everything thoroughly, we would schedule the final inspection. Our Bellevue remodeling company would set up an appointment with the City Inspectors. After that is completed, you would get the final approval. Call Us!
Work | Approximate Time |
Deconstruction | 3 to 4 days |
Electrical work | 1 to 2 days |
Flooring and cabinet installation | 1 to 2 weeks |
Countertop fabrication | 7 to 10 days |
Plumbing and appliance | 1 to 2 days |
Backsplash and tiling | 2 to 3 days |
Painting | 2 to 3 days |
Final inspection | 1 day |
This is just an estimate of the time taken to complete the tasks for Bellevue kitchen remodeling. The time taken would depend on the scope. After carefully assessing your kitchen and your requirements, our team would be able to give you a more accurate estimate.
Here are some of the most commonly asked questions that our customers often have. Have any other queries? Contact us.
Most of the kitchen remodel projects that we undertake are full remodels. In full remodels, we would be giving a complete makeover
We can give you the samples of our project. They would help you get design ideas and also understand our capability. To get references for some of our completed projects for kitchen remodeling in Bellevue, contact us.